Fire Alarm – Friday, September 21st, 2012 at 4:30 PM

Last Friday around 4:30 PM the fire alarms went off, of course those of you home at that time know this. We had a nice, powerful rain storm that blew the clubhouse hatch going to the roof open. When this happened, the rain water coming in fried the smoke detector causing the alarms to go off. I was able to climb up and shut the hatch but the system would not reset. The alarm company was out here at 5:30 PM and was able to replace the smoke detector and make sure the roof hatch was secured.

Spa Heater

The parts have arrived for the spa heater that has been down since September 13th. The company will be here between 12 PM and 3 PM to install the parts and get the spa heater up and running. There was a problem caused when the gas company converted the spa heater to natural gas which caused the heating element to stop working. They found this out when they were about to replace the heating element last Wednesday and ordered the correct conversion kit for this specific heater. The heating element is covered under warranty but if the manufacturer stated it was caused by a bad conversion, they will not cover it. After speaking to Teco Gas, they accept full responsibility for this and will cover any and all costs associated with the repairs and conversion. The technician will also look at the other heaters for the pool since they are a different heater than the spa to make sure those were converted properly.

Residents Gate on Beau Drive

This morning I received an email from security stating the residents gate at Beau Drive was not working. They reported it was opening but not closing and it had to be manually closed. For some reason security turned the power off to this gate which is why most residents experienced the gates not functioning at all. The power has been restored as of 10:45AM and the gate company will be out later today to take a look at it and hopefully fix it.

Clubhouse Fan and Light

The Clubhouse fan and light has been reinstalled and is working now.

Theater Projector

The theater projector needed a new bulb which was ordered last week. The bulb will be in sometime early this week and the company will have the projector installed by the end of this week. Thank you everyone for your patience.