Elevator Tiles – Both Towers
The cracked tiles in the elevator (about two tiles per
elevator) will be replaced by Wayne Wiles this week . As soon as I get
the date they will be out here, I will let everyone know via the blog.
Clubhouse TV’s
Comcast was able to make it out on Friday to install all of
the cable boxes on the TVs in the clubhouse. The bracket to hang the TV on the
wall has come in and the TV will be installed tomorrow.
East Tower Second Floor Garage
The East Tower second floor garage door is not closing all
the way and is staying about 4 to 6 inches open at the bottom. The company has
been called out as of this morning when it was report edand they will be out
tomorrow to correct the problem.
Pool Deck
Just a reminder, we will be power washing the pool deck
tomorrow.
No comments:
Post a Comment