Tuesday, August 21, 2012


Elevator Tiles – Both Towers
The cracked tiles in the elevator (about two tiles per elevator) will be replaced by Wayne Wiles this week . As soon as I get the date they will be out here, I will let everyone know via the blog.

Clubhouse TV’s
Comcast was able to make it out on Friday to install all of the cable boxes on the TVs in the clubhouse. The bracket to hang the TV on the wall has come in and the TV will be installed tomorrow.

East Tower Second Floor Garage
The East Tower second floor garage door is not closing all the way and is staying about 4 to 6 inches open at the bottom. The company has been called out as of this morning when it was report edand they will be out tomorrow to correct the problem.

Pool Deck
Just a reminder, we will be power washing the pool deck tomorrow.