Friday, August 13, 2010

Update - Friday 13th August

Update on Gates by the Dock
The lock bolt has been installed at the gate by the spa. The gate and access system have been adjusted to prevent the gate from getting caught up, which should allow the gate to close and open more easily. In the interests of security, please remember when closing the gate to make sure it closes all the way and locks.

Update on the Spa
Yesterday, August 12th, ACES was out here to repair the spa heater. Unfortunately, they misdiagnosed the problem and had to order another part. They will be out at the property Monday Morning to install the new integrated control for the spa heater.

East Tower Handrail
The ramp leading from the clubhouse to the east tower garage will be fitted with a handrail by the end of the month. Please take care in this area in the interim.

No comments:

Post a Comment